Hello,
I'm trying to run concurrent jobs on different storage resources. For
example, there is no problem in doing a tape backup at the same time as
a disk backup and a DVD backup, but I don't really want two concurrent
backups to tape. So my configuration looks like this:
Director {
Maximum Concurrent Jobs = 3
[...]
Client {
Maximum Concurrent Jobs = 3
[...]
Storage {
Name = File
Maximum Concurrent Jobs = 1
[...]
Storage {
Name = Tape
Maximum Concurrent Jobs = 1
[...]
Storage {
Name = DVD
Maximum Concurrent Jobs = 1
# At bacula-sd.conf
FileDaemon {
Maximum Concurrent Jobs = 3
The fact is that it throttles one job at a time. Reading the
documentation, says this:
"To run concurrent jobs, you must set Maximum Concurrent Jobs = 2 in
five or six distinct places: in bacula-dir.conf in the Director, the
Job, the Client, the Storage resources; in bacula-fd in the FileDaemon
(or Client) resource, and in bacula-sd.conf in the Storage resource. If
any one is missing, it will throttle the jobs to one at a time. You may,
of course, set the Maximum Concurrent Jobs to more than 2."
Is it possible to configure the situation described above? Any hint on
what may I be doing wrong?
Thanks in advance, and keep the good work!