Post Netbackup 6.5 - disk staging Units 
Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or
copyright material. You must not read, copy, use or
disclose them without authorisation. If you are not an
intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Post Netbackup 6.5 - disk staging Units 
I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

Post Netbackup 6.5 - disk staging Units 
What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Post Netbackup 6.5 - disk staging Units 
Hello,

This is something I will be configuring ... Soon ...

Small changes to the environment at the moment, just upgraded and got an
un-expected DSU issue to clean first.

Adam.

-----Original Message-----
From: Curtis Preston [mailto:cpreston < at > glasshouse.com]
Sent: Thursday, 18 October 2007 4:07 PM
To: Kevin Whittaker; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: RE: [Veritas-bu] Netbackup 6.5 - disk staging Units

What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or
copyright material. You must not read, copy, use or
disclose them without authorisation. If you are not an
intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Post Netbackup 6.5 - disk staging Units 
I change the # of drives over the weekend. On Saturday nights, I change
the MAX_STAGING_DRIVES from 2 to 5, if vaulting is almost done and there
is enough drives available. Then after it starts I change it right
back. I am concerned that have to deal with a storage unit will cause
issues with being required to cycle netbackup after changing the storage
unit.

Kevin

-----Original Message-----
From: Curtis Preston [mailto:cpreston < at > glasshouse.com]
Sent: Thursday, October 18, 2007 4:07 AM
To: Kevin Whittaker; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: RE: [Veritas-bu] Netbackup 6.5 - disk staging Units

What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

Post Netbackup 6.5 - disk staging Units 
I can think of an issue. When you create a storage unit, you need to
define what drives are in it. Let's say I have a tape library with 10
drives, but I only want to use 4 of them for disk staging. If I create a
storage unit, I am limited to those four physical drives. If I want to
leave those drives also available for backups - storage unit with 10 drives
in it- A backup may pick on of my staging unit drives, and now I am limited
to three drives even though there may be available drives in the library,
just not defined in that particular storage unit. The touch file allowed
for greater flexibility for staging to pick any four of the ten drives
available.




Reneé Carlisle
ServerWare Corporation






-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Curtis
Preston
Sent: Thursday, October 18, 2007 4:07 AM
To: Kevin Whittaker; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu



_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Post Netbackup 6.5 - disk staging Units 
I'm not yes seeing this as a problem,

Doesn't netbackup Storage units consider all available drives, of a particular density eg HCART2, for the library eg ACS 0, that are configured in netbackup say 10 of them, fair game for any storage unit.

if the storage unit "staging_A" is configured for a maximum of 4 drives then that's all it can use,
If the storage unit "backups_C" is configured for a maximum of 10 drives, then it will use all of the drives.

Should the priority configured for staging (99999 by default isnt it?) mean that it gets it's 4 drives when needed and backups can use them when not ?

Adam.

-----Original Message-----
From: rcarlisle [mailto:rcarlisle < at > serverwarecorp.com]
Sent: Thursday, 18 October 2007 7:36 PM
To: 'Curtis Preston'; 'Kevin Whittaker'; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: RE: [Veritas-bu] Netbackup 6.5 - disk staging Units

I can think of an issue. When you create a storage unit, you need to define what drives are in it. Let's say I have a tape library with 10 drives, but I only want to use 4 of them for disk staging. If I create a storage unit, I am limited to those four physical drives. If I want to leave those drives also available for backups - storage unit with 10 drives in it- A backup may pick on of my staging unit drives, and now I am limited to three drives even though there may be available drives in the library, just not defined in that particular storage unit. The touch file allowed for greater flexibility for staging to pick any four of the ten drives available.




Reneé Carlisle
ServerWare Corporation






-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Curtis
Preston
Sent: Thursday, October 18, 2007 4:07 AM
To: Kevin Whittaker; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or
copyright material. You must not read, copy, use or
disclose them without authorisation. If you are not an
intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Post Netbackup 6.5 - disk staging Units 
Adam,

Nope you're right which reminds why I don't usually respond to these things
when I have been up all night working support issues and haven't had my
first cup of coffee yet! I was thinking too literal. Yes, you could easily
do that.




Reneé Carlisle
ServerWare Corporation
-----Original Message-----
From: Mellor, Adam A. [mailto:Adam.Mellor < at > woodside.com.au]
Sent: Thursday, October 18, 2007 7:48 AM
To: rcarlisle; Curtis Preston; Kevin Whittaker;
VERITAS-BU < at > mailman.eng.auburn.edu
Subject: RE: [Veritas-bu] Netbackup 6.5 - disk staging Units

I'm not yes seeing this as a problem,

Doesn't netbackup Storage units consider all available drives, of a
particular density eg HCART2, for the library eg ACS 0, that are configured
in netbackup say 10 of them, fair game for any storage unit.

if the storage unit "staging_A" is configured for a maximum of 4 drives then
that's all it can use,
If the storage unit "backups_C" is configured for a maximum of 10 drives,
then it will use all of the drives.

Should the priority configured for staging (99999 by default isnt it?) mean
that it gets it's 4 drives when needed and backups can use them when not ?

Adam.

-----Original Message-----
From: rcarlisle [mailto:rcarlisle < at > serverwarecorp.com]
Sent: Thursday, 18 October 2007 7:36 PM
To: 'Curtis Preston'; 'Kevin Whittaker'; Mellor, Adam A.;
VERITAS-BU < at > mailman.eng.auburn.edu
Subject: RE: [Veritas-bu] Netbackup 6.5 - disk staging Units

I can think of an issue. When you create a storage unit, you need to
define what drives are in it. Let's say I have a tape library with 10
drives, but I only want to use 4 of them for disk staging. If I create a
storage unit, I am limited to those four physical drives. If I want to
leave those drives also available for backups - storage unit with 10 drives
in it- A backup may pick on of my staging unit drives, and now I am limited
to three drives even though there may be available drives in the library,
just not defined in that particular storage unit. The touch file allowed
for greater flexibility for staging to pick any four of the ten drives
available.




Reneé Carlisle
ServerWare Corporation






-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Curtis
Preston
Sent: Thursday, October 18, 2007 4:07 AM
To: Kevin Whittaker; Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

What's wrong with creating an additional storage unit?

---
W. Curtis Preston
Backup Blog < at > www.backupcentral.com
VP Data Protection, GlassHouse Technologies

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Kevin
Whittaker
Sent: Wednesday, October 17, 2007 7:47 AM
To: Mellor, Adam A.; VERITAS-BU < at > mailman.eng.auburn.edu
Subject: Re: [Veritas-bu] Netbackup 6.5 - disk staging Units

I am scheduled to upgrade from 5.1 to 6.5 and would be very interested
in the answer to this question. I checked the documentation and in the
Veritas NetBackup 6.5 Admin Guide for UNIX and Linux Vol 1 had the
answer... I think

On page 250: It says that the final destination storage unit will
control the "maximum concurrent write drives". That explanation was on
page 231.

This is not good! I do not want to have to create a new storage unit to
control the # of drives that the copy from disk to tape will use.

Has anybody found out anything more on this issue?

Kevin

-----Original Message-----
From: veritas-bu-bounces < at > mailman.eng.auburn.edu
[mailto:veritas-bu-bounces < at > mailman.eng.auburn.edu] On Behalf Of Mellor,
Adam A.
Sent: Wednesday, October 17, 2007 7:32 AM
To: VERITAS-BU < at > mailman.eng.auburn.edu
Subject: [Veritas-bu] Netbackup 6.5 - disk staging Units

Good evening,

I have another NBU 6.5 Question,

I have just completed my 5.1 to 6.5 upgrade, no real drama's with the
upgrade.

I am monitoring the progress of the scheduled backups to see how much
carnage there is.

My disk staging units are using all of the available tape drives,
previously in NBU 5.1 I was able to limit this using the
MAX_STAGING_JOBS touchfile.

Is there some way to limit the number of jobs for de-staging disk
backups in 6.5 ?

Thanks,

Back to monitoring logs...

Adam Mellor
Senior Unix Support Analyst
CF IT TECHNOLOGY SERVICES
Woodside Energy Ltd.

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or copyright material.
You must not read, copy, use or disclose them without authorisation. If
you are not an intended recipient, please contact us at once by return
email and then delete both messages and all attachments.

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

NOTICE: This email and any attachments are confidential.
They may contain legally privileged information or
copyright material. You must not read, copy, use or
disclose them without authorisation. If you are not an
intended recipient, please contact us at once by return
email and then delete both messages and all attachments.



_______________________________________________
Veritas-bu maillist - Veritas-bu < at > mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

View user's profile Send private message
Display posts from previous:
Reply to topic Page 1 of 1
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
  


Magic SEO URL for phpBB